{"id":89320,"date":"2020-10-27T20:25:14","date_gmt":"2020-10-27T18:25:14","guid":{"rendered":"https:\/\/www.ekoenergy.org\/additional-call-for-1-river-restoration-project-in-finland\/"},"modified":"2022-02-09T15:14:58","modified_gmt":"2022-02-09T13:14:58","slug":"additional-call-for-1-river-restoration-project-in-finland","status":"publish","type":"post","link":"https:\/\/www.ekoenergy.org\/cs\/additional-call-for-1-river-restoration-project-in-finland\/","title":{"rendered":"Additional call for a river restoration project in Finland"},"content":{"rendered":"\n<div class=\"wp-block-image\"><figure class=\"alignright size-medium\"><img fetchpriority=\"high\" decoding=\"async\" width=\"320\" height=\"240\" src=\"https:\/\/www.ekoenergy.org\/wp-content\/uploads\/\/post-River-restoration-ekoenergy-team-2019-320x240.jpg\" alt=\"Group of happy people in and next to the river, with buckets and shovels. \" class=\"wp-image-89321\" srcset=\"https:\/\/www.ekoenergy.org\/wp-content\/uploads\/post-River-restoration-ekoenergy-team-2019-320x240.jpg 320w, https:\/\/www.ekoenergy.org\/wp-content\/uploads\/post-River-restoration-ekoenergy-team-2019.jpg 720w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/figure><\/div>\n\n\n\n<p>For each megawatt-hour sold as EKOenergy hydropower, a contribution of at least 0.10 \u20ac (ten cents) is paid to EKOenergy\u2019s Environmental Fund. These contributions are used to finance the implementation of river restoration projects. For this year, and after a previous call in the spring, we still have 15,000 euros in the Fund. The money comes from sales of EKOenergy-labelled hydropower in Finland and will therefore be used for projects in Finland.<\/p>\n\n\n\n<p>We prefer to assign this money to a concrete project during the current year. We welcome applications! <\/p>\n\n\n\n<p>Applications must be submitted no later than <strong>22 November 2020<\/strong>. An expert group will select the best projects from the proposals we receive.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"general\">General<\/h2>\n\n\n\n<p>The requested amount can be maximum 15,000 \u20ac. The applicant\u2019s financial solvency and previous experience of similar projects, as well as the high communication potential and the possibility to duplicate the project, will be considered as advantages. Above all, the projects will be assessed from the perspective of their ecological significance. We want to achieve the greatest possible environmental benefit in a cost-effective manner. Co-financing is also possible.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"what-to-include-in-your-application\">What to include in your application?<\/h2>\n\n\n\n<p>Keep the application short (max 3 pages \u2013 pdf).<\/p>\n\n\n\n<p>Applications can be made in Finnish, Swedish or English. Please add a 300 word summary in English.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>A brief and clear description of the project itself: what, where, when, who, to whom, and why.<\/li><li>The nature conservation outcomes the project aims to achieve. Briefly describing which species and habitats will benefit from the project.<\/li><li>Which organisation will be responsible for implementing the project.<\/li><li>The contact details (name, telephone, e-mail).<\/li><li>Information on how you plan to communicate about the project. Briefly describing the communication channels you have.<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"other-information-and-instructions\">Other information and instructions<\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li>Please send your application by Sunday 22 November (end of the day) by email to <a href=\"mailto:ekoenergyfunds@sll.fi\">ekoenergyfunds<\/a><img decoding=\"async\" width=\"12\" height=\"12\" class=\"wp-image-29167\" style=\"width: 12px;\" src=\"https:\/\/www.ekoenergy.org\/wp-content\/uploads\/small-EKOenergy-symbol-for-emails.jpg\" alt=\"\"><a href=\"mailto:ekoenergyfunds@sll.fi\">sll.fi<\/a><\/li><li>If we do not respond to your email within 48 hours of sending it, contact us.<\/li><\/ul>\n\n\n\n<p>Additional information:<br>Steven Vanholme<br><a href=\"mailto:Steven.Vanholme@sll.fi\">steven.vanholme<img decoding=\"async\" width=\"12\" height=\"12\" class=\"wp-image-29167\" style=\"width: 12px;\" src=\"https:\/\/www.ekoenergy.org\/wp-content\/uploads\/small-EKOenergy-symbol-for-emails.jpg\">sll.fi<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>For each megawatt-hour sold as EKOenergy hydropower, a contribution of at least 0.10 \u20ac (ten cents) is paid to EKOenergy\u2019s Environmental Fund. These contributions are used to finance the implementation of river restoration projects. For this year, and after a previous call in the spring, we still have 15,000 euros in the Fund. The money [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":89321,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"default","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"default","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[527],"tags":[529],"class_list":["post-89320","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-cs","tag-100-renewable-cs"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Additional call for a river restoration project in Finland - EKOenergy ecolabel<\/title>\n<meta name=\"description\" content=\"There is another 15,000 euro in our Environmental Fund, for a river project. Applications must be submitted no later than 22 November 2020\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ekoenergy.org\/cs\/additional-call-for-1-river-restoration-project-in-finland\/\" \/>\n<meta property=\"og:locale\" content=\"cs_CZ\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Additional call for a river restoration project in Finland - EKOenergy ecolabel\" \/>\n<meta property=\"og:description\" content=\"There is another 15,000 euro in our Environmental Fund, for a river project. Applications must be submitted no later than 22 November 2020\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ekoenergy.org\/cs\/additional-call-for-1-river-restoration-project-in-finland\/\" \/>\n<meta property=\"og:site_name\" content=\"EKOenergy ecolabel\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/EKOenergy.ecolabel\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-10-27T18:25:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-02-09T13:14:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.ekoenergy.org\/wp-content\/uploads\/post-River-restoration-ekoenergy-team-2019.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"540\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Steven Vanholme\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@EKOenergy_\" \/>\n<meta name=\"twitter:site\" content=\"@EKOenergy_\" \/>\n<meta name=\"twitter:label1\" content=\"Napsal(a)\" \/>\n\t<meta name=\"twitter:data1\" content=\"Steven Vanholme\" \/>\n\t<meta name=\"twitter:label2\" content=\"Odhadovan\u00e1 doba \u010dten\u00ed\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minuty\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/additional-call-for-1-river-restoration-project-in-finland\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/additional-call-for-1-river-restoration-project-in-finland\\\/\"},\"author\":{\"name\":\"Steven Vanholme\",\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/#\\\/schema\\\/person\\\/21444e1bd72d5e9e9961c611c50e33f4\"},\"headline\":\"Additional call for a river restoration project in Finland\",\"datePublished\":\"2020-10-27T18:25:14+00:00\",\"dateModified\":\"2022-02-09T13:14:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/additional-call-for-1-river-restoration-project-in-finland\\\/\"},\"wordCount\":326,\"publisher\":{\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/additional-call-for-1-river-restoration-project-in-finland\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.ekoenergy.org\\\/wp-content\\\/uploads\\\/post-River-restoration-ekoenergy-team-2019.jpg\",\"keywords\":[\"100% renewable\"],\"articleSection\":[\"News\"],\"inLanguage\":\"cs\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/additional-call-for-1-river-restoration-project-in-finland\\\/\",\"url\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/additional-call-for-1-river-restoration-project-in-finland\\\/\",\"name\":\"Additional call for a river restoration project in Finland - EKOenergy ecolabel\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/additional-call-for-1-river-restoration-project-in-finland\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/additional-call-for-1-river-restoration-project-in-finland\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.ekoenergy.org\\\/wp-content\\\/uploads\\\/post-River-restoration-ekoenergy-team-2019.jpg\",\"datePublished\":\"2020-10-27T18:25:14+00:00\",\"dateModified\":\"2022-02-09T13:14:58+00:00\",\"description\":\"There is another 15,000 euro in our Environmental Fund, for a river project. Applications must be submitted no later than 22 November 2020\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/additional-call-for-1-river-restoration-project-in-finland\\\/#breadcrumb\"},\"inLanguage\":\"cs\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/additional-call-for-1-river-restoration-project-in-finland\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/additional-call-for-1-river-restoration-project-in-finland\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.ekoenergy.org\\\/wp-content\\\/uploads\\\/post-River-restoration-ekoenergy-team-2019.jpg\",\"contentUrl\":\"https:\\\/\\\/www.ekoenergy.org\\\/wp-content\\\/uploads\\\/post-River-restoration-ekoenergy-team-2019.jpg\",\"width\":720,\"height\":540},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/additional-call-for-1-river-restoration-project-in-finland\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Additional call for a river restoration project in Finland\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/#website\",\"url\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/\",\"name\":\"EKOenergy ecolabel\",\"description\":\"The global nonprofit ecolabel for renewable energy\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"cs\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/#organization\",\"name\":\"Not-for-profit Organisation EKOenergy\",\"url\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.ekoenergy.org\\\/wp-content\\\/uploads\\\/logo-EKOenergy-no-text.jpg\",\"contentUrl\":\"https:\\\/\\\/www.ekoenergy.org\\\/wp-content\\\/uploads\\\/logo-EKOenergy-no-text.jpg\",\"width\":1600,\"height\":1600,\"caption\":\"Not-for-profit Organisation EKOenergy\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/EKOenergy.ecolabel\\\/\",\"https:\\\/\\\/x.com\\\/EKOenergy_\",\"https:\\\/\\\/www.instagram.com\\\/ekoenergy\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/ekoenergy-ecolabel\\\/\",\"https:\\\/\\\/www.youtube.com\\\/EKOenergy-ecolabel\",\"https:\\\/\\\/en.wikipedia.org\\\/wiki\\\/EKOenergy\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/#\\\/schema\\\/person\\\/21444e1bd72d5e9e9961c611c50e33f4\",\"name\":\"Steven Vanholme\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"cs\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f99c9eea0dbfa3f163e1bfeb0842dbafe6ea1d33375ef30b2eb770f7ce6973f6?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f99c9eea0dbfa3f163e1bfeb0842dbafe6ea1d33375ef30b2eb770f7ce6973f6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f99c9eea0dbfa3f163e1bfeb0842dbafe6ea1d33375ef30b2eb770f7ce6973f6?s=96&d=mm&r=g\",\"caption\":\"Steven Vanholme\"},\"url\":\"https:\\\/\\\/www.ekoenergy.org\\\/cs\\\/author\\\/svanholme\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Additional call for a river restoration project in Finland - EKOenergy ecolabel","description":"There is another 15,000 euro in our Environmental Fund, for a river project. Applications must be submitted no later than 22 November 2020","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ekoenergy.org\/cs\/additional-call-for-1-river-restoration-project-in-finland\/","og_locale":"cs_CZ","og_type":"article","og_title":"Additional call for a river restoration project in Finland - EKOenergy ecolabel","og_description":"There is another 15,000 euro in our Environmental Fund, for a river project. Applications must be submitted no later than 22 November 2020","og_url":"https:\/\/www.ekoenergy.org\/cs\/additional-call-for-1-river-restoration-project-in-finland\/","og_site_name":"EKOenergy ecolabel","article_publisher":"https:\/\/www.facebook.com\/EKOenergy.ecolabel\/","article_published_time":"2020-10-27T18:25:14+00:00","article_modified_time":"2022-02-09T13:14:58+00:00","og_image":[{"width":720,"height":540,"url":"https:\/\/www.ekoenergy.org\/wp-content\/uploads\/post-River-restoration-ekoenergy-team-2019.jpg","type":"image\/jpeg"}],"author":"Steven Vanholme","twitter_card":"summary_large_image","twitter_creator":"@EKOenergy_","twitter_site":"@EKOenergy_","twitter_misc":{"Napsal(a)":"Steven Vanholme","Odhadovan\u00e1 doba \u010dten\u00ed":"2 minuty"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.ekoenergy.org\/cs\/additional-call-for-1-river-restoration-project-in-finland\/#article","isPartOf":{"@id":"https:\/\/www.ekoenergy.org\/cs\/additional-call-for-1-river-restoration-project-in-finland\/"},"author":{"name":"Steven Vanholme","@id":"https:\/\/www.ekoenergy.org\/cs\/#\/schema\/person\/21444e1bd72d5e9e9961c611c50e33f4"},"headline":"Additional call for a river restoration project in Finland","datePublished":"2020-10-27T18:25:14+00:00","dateModified":"2022-02-09T13:14:58+00:00","mainEntityOfPage":{"@id":"https:\/\/www.ekoenergy.org\/cs\/additional-call-for-1-river-restoration-project-in-finland\/"},"wordCount":326,"publisher":{"@id":"https:\/\/www.ekoenergy.org\/cs\/#organization"},"image":{"@id":"https:\/\/www.ekoenergy.org\/cs\/additional-call-for-1-river-restoration-project-in-finland\/#primaryimage"},"thumbnailUrl":"https:\/\/www.ekoenergy.org\/wp-content\/uploads\/post-River-restoration-ekoenergy-team-2019.jpg","keywords":["100% renewable"],"articleSection":["News"],"inLanguage":"cs"},{"@type":"WebPage","@id":"https:\/\/www.ekoenergy.org\/cs\/additional-call-for-1-river-restoration-project-in-finland\/","url":"https:\/\/www.ekoenergy.org\/cs\/additional-call-for-1-river-restoration-project-in-finland\/","name":"Additional call for a river restoration project in Finland - EKOenergy ecolabel","isPartOf":{"@id":"https:\/\/www.ekoenergy.org\/cs\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ekoenergy.org\/cs\/additional-call-for-1-river-restoration-project-in-finland\/#primaryimage"},"image":{"@id":"https:\/\/www.ekoenergy.org\/cs\/additional-call-for-1-river-restoration-project-in-finland\/#primaryimage"},"thumbnailUrl":"https:\/\/www.ekoenergy.org\/wp-content\/uploads\/post-River-restoration-ekoenergy-team-2019.jpg","datePublished":"2020-10-27T18:25:14+00:00","dateModified":"2022-02-09T13:14:58+00:00","description":"There is another 15,000 euro in our Environmental Fund, for a river project. Applications must be submitted no later than 22 November 2020","breadcrumb":{"@id":"https:\/\/www.ekoenergy.org\/cs\/additional-call-for-1-river-restoration-project-in-finland\/#breadcrumb"},"inLanguage":"cs","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ekoenergy.org\/cs\/additional-call-for-1-river-restoration-project-in-finland\/"]}]},{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/www.ekoenergy.org\/cs\/additional-call-for-1-river-restoration-project-in-finland\/#primaryimage","url":"https:\/\/www.ekoenergy.org\/wp-content\/uploads\/post-River-restoration-ekoenergy-team-2019.jpg","contentUrl":"https:\/\/www.ekoenergy.org\/wp-content\/uploads\/post-River-restoration-ekoenergy-team-2019.jpg","width":720,"height":540},{"@type":"BreadcrumbList","@id":"https:\/\/www.ekoenergy.org\/cs\/additional-call-for-1-river-restoration-project-in-finland\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ekoenergy.org\/cs\/"},{"@type":"ListItem","position":2,"name":"Additional call for a river restoration project in Finland"}]},{"@type":"WebSite","@id":"https:\/\/www.ekoenergy.org\/cs\/#website","url":"https:\/\/www.ekoenergy.org\/cs\/","name":"EKOenergy ecolabel","description":"The global nonprofit ecolabel for renewable energy","publisher":{"@id":"https:\/\/www.ekoenergy.org\/cs\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ekoenergy.org\/cs\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"cs"},{"@type":"Organization","@id":"https:\/\/www.ekoenergy.org\/cs\/#organization","name":"Not-for-profit Organisation EKOenergy","url":"https:\/\/www.ekoenergy.org\/cs\/","logo":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/www.ekoenergy.org\/cs\/#\/schema\/logo\/image\/","url":"https:\/\/www.ekoenergy.org\/wp-content\/uploads\/logo-EKOenergy-no-text.jpg","contentUrl":"https:\/\/www.ekoenergy.org\/wp-content\/uploads\/logo-EKOenergy-no-text.jpg","width":1600,"height":1600,"caption":"Not-for-profit Organisation EKOenergy"},"image":{"@id":"https:\/\/www.ekoenergy.org\/cs\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/EKOenergy.ecolabel\/","https:\/\/x.com\/EKOenergy_","https:\/\/www.instagram.com\/ekoenergy\/","https:\/\/www.linkedin.com\/company\/ekoenergy-ecolabel\/","https:\/\/www.youtube.com\/EKOenergy-ecolabel","https:\/\/en.wikipedia.org\/wiki\/EKOenergy"]},{"@type":"Person","@id":"https:\/\/www.ekoenergy.org\/cs\/#\/schema\/person\/21444e1bd72d5e9e9961c611c50e33f4","name":"Steven Vanholme","image":{"@type":"ImageObject","inLanguage":"cs","@id":"https:\/\/secure.gravatar.com\/avatar\/f99c9eea0dbfa3f163e1bfeb0842dbafe6ea1d33375ef30b2eb770f7ce6973f6?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f99c9eea0dbfa3f163e1bfeb0842dbafe6ea1d33375ef30b2eb770f7ce6973f6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f99c9eea0dbfa3f163e1bfeb0842dbafe6ea1d33375ef30b2eb770f7ce6973f6?s=96&d=mm&r=g","caption":"Steven Vanholme"},"url":"https:\/\/www.ekoenergy.org\/cs\/author\/svanholme\/"}]}},"uagb_featured_image_src":{"full":["https:\/\/www.ekoenergy.org\/wp-content\/uploads\/post-River-restoration-ekoenergy-team-2019.jpg",720,540,false],"thumbnail":["https:\/\/www.ekoenergy.org\/wp-content\/uploads\/post-River-restoration-ekoenergy-team-2019-150x150.jpg",150,150,true],"medium":["https:\/\/www.ekoenergy.org\/wp-content\/uploads\/post-River-restoration-ekoenergy-team-2019-320x240.jpg",320,240,true],"medium_large":["https:\/\/www.ekoenergy.org\/wp-content\/uploads\/post-River-restoration-ekoenergy-team-2019.jpg",720,540,false],"large":["https:\/\/www.ekoenergy.org\/wp-content\/uploads\/post-River-restoration-ekoenergy-team-2019.jpg",720,540,false],"1536x1536":["https:\/\/www.ekoenergy.org\/wp-content\/uploads\/post-River-restoration-ekoenergy-team-2019.jpg",720,540,false],"2048x2048":["https:\/\/www.ekoenergy.org\/wp-content\/uploads\/post-River-restoration-ekoenergy-team-2019.jpg",720,540,false]},"uagb_author_info":{"display_name":"Steven Vanholme","author_link":"https:\/\/www.ekoenergy.org\/cs\/author\/svanholme\/"},"uagb_comment_info":0,"uagb_excerpt":"For each megawatt-hour sold as EKOenergy hydropower, a contribution of at least 0.10 \u20ac (ten cents) is paid to EKOenergy\u2019s Environmental Fund. These contributions are used to finance the implementation of river restoration projects. For this year, and after a previous call in the spring, we still have 15,000 euros in the Fund. The money&hellip;","_links":{"self":[{"href":"https:\/\/www.ekoenergy.org\/cs\/wp-json\/wp\/v2\/posts\/89320","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ekoenergy.org\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ekoenergy.org\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ekoenergy.org\/cs\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ekoenergy.org\/cs\/wp-json\/wp\/v2\/comments?post=89320"}],"version-history":[{"count":2,"href":"https:\/\/www.ekoenergy.org\/cs\/wp-json\/wp\/v2\/posts\/89320\/revisions"}],"predecessor-version":[{"id":110620,"href":"https:\/\/www.ekoenergy.org\/cs\/wp-json\/wp\/v2\/posts\/89320\/revisions\/110620"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ekoenergy.org\/cs\/wp-json\/wp\/v2\/media\/89321"}],"wp:attachment":[{"href":"https:\/\/www.ekoenergy.org\/cs\/wp-json\/wp\/v2\/media?parent=89320"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ekoenergy.org\/cs\/wp-json\/wp\/v2\/categories?post=89320"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ekoenergy.org\/cs\/wp-json\/wp\/v2\/tags?post=89320"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}